Project Summary

  • Client 

    Immeubles SNPL Inc. SNPL Properties Inc. Alberta Ltd. & Penny Lane 11 Ltd. Partnership

  • Budget

    $196.8 Million

  • Size

    850,000 sq. ft.

  • Delivery Model 

    Construction Management with a GMP 

  • Year Complete 

    2015

  • Sector 

    Commercial Office

The Story

Upon completion of the Eighth Avenue Place East Tower, EllisDon was awarded Completion: November 2014 the contract to construct the neighbouring Eighth Avenue Place West Tower.

The west tower is a new 40-storey 850,000 square foot tower in downtown Calgary. A new three-storey lobby will connect the new tower to the existing east tower and winter garden. The new tower is situated diagonally across from the existing tower on the site, and will be sloped in the opposite direction from the existing tower, maximizing tower views for occupants of both towers.

Architectural crown lighting as well as vertical light features are being incorporated into the exterior design, creating a striking effect at night. Each floor plate is approximately 22,000 square feet of Class AAA office space with floor to ceiling windows. This new tower is being built on top of an existing two-storey podium and six-storey underground parkade, which will continue to operate during construction.

Normal distance for a crane from the building’s core is 10 to 15 feet. The generally acknowledged record was 45 feet. We needed to go 60.

Mike Demelo, V.P. Equipment Division, EllisDon

The mechanical systems feature variable air distribution system and perimeter air curtains, thermal energy monitoring and control, and state of the art building monitoring and control systems. The electrical systems feature dual telecommunications riser with access on every floor, high performance T5 lamp technology and low heat building standard lights. The unitized curtainwall is inspired by the Rocky Mountains.

The construction challenge of this project is the limited space on site, working beside the existing glass winter garden and east tower. The solution is to have just-in-time deliveries, and a specially constructed protection system for winter garden.

A unique element of this project is the building maintenance swing stage and crane will be permanently mounted on top of structure, as well as the snow and ice hot water deluge melting system.

One York

Toronto

When Menkes and HOOPP first proposed the idea of this 34-storey office tower, they had to consider not only who would be able to deliver a project ...

More about this project

TD Lego - Tenant Fit Up

Toronto

This project consisted of the fit-up of an occupied building of which the client owns ten floors. These ten floors underwent a refresh o...

More about this project

Brentwood Town Centre Redevelopment - Phase 1

Burnaby

Phase 1 at Brentwood Town Centre is a high profile, mixed use and transit-oriented redevelopment located in north Burnaby, BC. This new development...

More about this project