Toronto TD Lego - Tenant Fit Up

Project Summary

  • Client

    Confidential

  • Budget

    Confidential

  • Size

    225,600 sq.ft.

  • Delivery Model

    Integrated Project Delivery

The Story

This project best timing for levitra consisted of the fit-up of an occupied building of which the client owns ten floors. These ten floors underwent a refresh of interior finishes and fixtures that provides a more improved and productive work levitra discount drugs experience. Overall, the project scope of work includes a total upgrade of existing systems (voice/data), and a refresh that includes new walls, ceilings, flooring, signage, and lighting. Along with the aforementioned, the mechanical, electrical and how you get pfizer viagra communications systems were also updated.

This project was delivered through an Integrated Project Delivery contract, in collaboration with a nine-party team. It is also important to note that EllisDon was brought on early to resolve any issues and reduce risk prior cialis for daily use to Construction.

One York

Toronto

When Menkes and HOOPP first proposed the idea of this 34-storey office tower, they had to consider not only who would be able to deliver a project ...

More about this project

400 West Georgia

Vancouver

At 301-feet-tall, 400 West Georgia is a unique 24-storey commercial tower with a structural cialis online doctor steel frame, a concrete core, and a six level underground parking garage with 235 stalls.

More about this project

Brentwood Town Centre Redevelopment - Phase 1

Burnaby

The Brentwood Site presents purchase viagra uk a unique opportunity to realize the vision established by the Brentwood Town Centre Development Plan. Inspired by the C...

More about this project