    Greater Toronto Airports Authority

  • Size

    300,000 sq. ft.

The Story

Since 1991, EllisDon has maintained a strong relationship with the Greater Toronto Airports Authority and completed the Main Terminal 3 Modifications Project in 2017. The project included the reconfiguration of the US Customs and Border Protection Agency (US CBP) area on the Departures Level; the expansion of the existing bag claim area on the Arrivals Level; the reconfiguration and expansion of the Departures Level passenger check-in and pre-board screening facilities; the reconfiguration and expansion of the Departures Level retail and food and beverage facilities and the relocation of the GTAA support and tenant areas, as required.