Back to Directory

  • Sectors

    Capital, Services, Buildings

  • Sub Sectors

    Infrastructure Developments, Financial Advisory, Healthcare & Research, Asset Management

  • Client

    The Province of Nova Scotia

  • Area Office

    Halifax

  • Size

    sq. Ft. 134,000

The Story

The Bayers Lake Community Outpatient Centre (BLCOC) is a milestone in Nova Scotia’s healthcare transformation. Located on a 15-acre site in Halifax’s Bayers Lake Business Park, this new facility is the province’s first public-private partnership healthcare project and a key component of the QEII New Generation initiative. The BLCOC includes 104 clinical spaces and will support delivery of a number of healthcare services, including primary care, renal dialysis, diagnostic imaging, eye care, and orthopedic assessment and rehabilitation.

Services include:

  • Clinics such as primary care, renal dialysis, diagnostic imaging, eye care, and orthopedic assessment and rehabilitation
  • 24 dialysis stations
  • Diagnostic imaging (x-ray, ultrasound, bone density)
  • Blood collection and post-treatment follow-ups

Development and Equity

The province selected EllisDon Infrastructure Healthcare, a consortium led by EllisDon Capital Inc. (EDC), to design, build, finance, and maintain the BLCOC project. EDC provided a single point of contact for the client and secured commercial and Financial Close.

EDC also ran a competitive funding process and structured a solution that balanced short-term flexibility with long-term stability.

Facilities Services

EllisDon Facilities Services Inc. (EDFS) is delivering facility and lifecycle maintenance services for a 30-year term, beginning August 2023. The team’s scope includes:

  • Maintenance and repair (plant) services
  • Road grounds and landscape maintenance
  • Environmental management
  • Help desk
Furniture, Equipment & Design

EllisDon’s Furniture, Equipment & Design (FED) team managed the full furniture, fixtures and equipment (FF&E) scope, including establishing and maintaining the FF&E database, design coordination, scheduling, and procurement of all In-Contract equipment. The team also led the design, scheduling, and installation of Not-In-Contract FF&E. Their work ensured seamless integration of medical and operational assets into the facility.

Sustainability

The BLCOC is designed as a place of healing, with sustainability at its core. The center's sustainable initiatives are noteworthy, such as the stormwater retention pond that captures and infiltrates all rainfall on the site, and the energy-efficient design features of the building systems. The site layout prioritizes accessibility, natural light, and views of restored green spaces—enhancing wellness for patients, families, and staff.

Key features include:

  • Stormwater retention pond that captures and infiltrates all rainfall on the site.
  • Energy-efficient design features reducing estimated building energy consumption by approximately 39% reduction compared to a baseline
  • Re-naturalized landscapes, dedicated places of respite for staff and visitors, and connected pedestrian pathways
  • Inclusive design for diverse communities and mobility needs
Achievement
  • LEEDv4 Healthcare Gold Certification, 2024

Latest Projects

Whether you’re exploring partnership or seeking guidance on a development, we’re ready to help you move forward with confidence.

Contact Us