    3.2 MW Capacity at Full Build-out

  • Size

    5,000 sq. ft.

The Story

This two-storey greenfield utility grid control center was completed in 2021 and included 5,000 square feet of white space, 750 kW of “Day 1” critical infrastructure, and provisioning for up to 3.2 MW of critical load. The structure also features three control rooms, office areas, and additional infrastructure space.