Hydro One – Integrated Systems Operations Center
Client
Hydro One
Area Office
Orilla
Budget
Confidential
Year Completed
2021
Size
3.2 MW Capacity at Full Build-out / 5,000 sq. ft.
Sector
Life Sciences & Technology
Sub-Sector
Data Centers
Scope
- Involved the construction of a two-storey greenfield utility grid control center which included 5,000 sq. ft. of white space, 750 kW of “Day 1” critical infrastructure, and provisioning for up to 3.2 MW of critical load.
- Features three control rooms, office areas, and infrastructure space.