Scotford Yard Grading And Drainage
Client
Canadian National Railway
Area Office
Fort Saskatchewan
Year Completed
2018
Sectors
Civil
Industrial
Sub-Sector
Earthworks
The Story
PME Inc. completed the Grading and Drainage scope to assist CN in the Scotford Yard Rail Expansion. This allowed for the addition of six new switch out lanes to be constructed that tied into the existing track structure.
PME Scope
- Strip to Stockpile - 2100 m3
- Topsoil Replacement - 840 m3
- Excavation to Stockpile - 20000 m3
- Cut to Fill - 11200 m3
- Offsite Import of Fill Placement - 17800 m3
- Supply and Install of Gravel - 1560 m3
- Supply and Install of Geotextile - 13200 m2
- Supply and Install of Subballast - 7920 m3
- Seeding, Mulching and Fertilizing - 9900 m2
- CSP Supply & Install, including Rip Rap Ends
- 900mm Dia. - 44 lm
- 600mm Dia. - 75 lm
- 300mm Dia - 250 lm
- Supply & Install 150mm dia. Corrugated HDPE Perforated Subdrain - 1780 lm
- Demolition of Unloading Pit - 1 Each
- Pile Cutting for Unloading Pit - 8 Each
- Fill of Unloading Pit after Dewatering - 530 m3
- Gravel Placement - 442 m3